89.1 MWdc / 60 MWac PV
50 MWAC
2026 Q1
Niland, CA
Vega 3 is an 89.1 MWdc / 60 MWac solar PV project paired with a 50 MWac battery storage system,located in Imperial County, California. Situated just east of Niland, this project continues Sunpin Energy’s strategic expansion in the region. Vega 3 offers strong fundamentals including interconnection with IID, site control, and revenue certainty through a 15-year PPA. It is designed to participate in the CAISO market and is eligible for federal tax incentives. With a compact footprint and efficient configuration, Vega 3 is an ideal asset for investors seeking long-term value from clean energy infrastructure.
265 Franklin Street, Suite 1702 Boston MA 02110
542-0081 2-6-3 Minamisenba, Chuo-ku, Toho 2nd Building, Room 601 Osaka City, Japan
Copyright © 2025 Sunpin Solar. All rights reserved.